Thursday, March 13, 2014

Piper Alpha

Piper Alpha
- Worst offshore disaster -

Summary data:
Date: July 6, 1988,
Location: North Sea 110 miles from Aberdeen, Scotland,
What happened: The platform experienced a series of  catastrophic explosions and fires. It had 226 people on board at the time of the event, 165 of whom perished (in addition, two emergency response personnel died during a rescue attempt). The platform was totally destroyed.
Causes: Simultaneous maintenance work on the pump and safety valve resulted in a condensate leak.



What happened?


A release of light hydrocarbon (condensate; propane, butane, and pentane) occurred when a pump was restarted after maintenance. Unaware to the personnel starting the pump, a relief valve in the pump discharge had also been removed for service and a blank had been loosely installed in its place on the piping flange. Upon restart of the pump, this flange leaked, producing a flammable hydrocarbon cloud, which subsequently found an ignition source.

The Piper Alpha platform was at the hub of a network of platforms interconnected by oil and gas pipelines. The initial explosion ruptured oil lines on Piper Alpha and the leaks were fed by the still-pressurized inter-platform pipelines. Managers on other platforms, aware of a problem on Piper Alpha (but not its severity), assumed that they would be instructed to shut down their operations, if needed. However, the explosion had interrupted communications from Piper Alpha and considerable intervals (from 30 to 60 minutes) passed before these other platforms were shut in.

A series of follow-on explosions occurred as the fires on the platform weakened natural gas riser pipelines on Piper Alpha. The intensity of the fires prevented rescue efforts, either by helicopter or by ship. At the height of the event, natural gas was being burned on Piper Alpha at a rate equivalent to the entire United Kingdom natural gas consumption rate.

Many of the platform crew retreated to the crew accommodation module, as they had been trained, to await evacuation. No organized attempt to was made to retreat from the accommodation module, even though it became increasingly apparent that the conditions in the module were becoming untenable. 81 personnel died from smoke inhalation in the crew quarters, awaiting further instructions that never came. Survivors found ways, on their own initiative, to get to the water (some jumping to the sea from considerable heights on the platform).


The subsequent investigation revealed the following :


·      Two separate work permits had been issued for the condensate pump, one for the pump repair and one for testing the relief valve. The relief valve job had not been completed by the end of the shift and, rather than working overtime to complete it, it was decided to terminate the permit for that day and continue on the next. The craft supervisor suspended the permit and returned it to the control room without notifying operations staff of the job status.

·      During shift turnover, the status of the pump work was addressed, but no mention was made of the relief valve work, and there was no mention of it in the control room or maintenance logs. Continuing problems with the adequacy of turnovers and log entries were a problem known to some (one staff member: “It was a surprise when you found out some things which were going on.”)

·      The work permits for the pump and the relief valve did not reference each other, and it is likely that the permits had been filed in separate locations (one on the control room and one in the Safety Office). When the on-line condensate pump failed later in the shift, creating an imperative to start the spare to enable continued production, control room personnel were only aware of the pump repair work permit, and proceeded to have the pump returned to service.

·      The permit to work (PTW) system was often not implemented according to procedure (“... the procedure was knowingly and flagrantly disregarded.”). For example, (1) omissions (e.g., signatures and gas test results) were common, (2) operations representatives often did not inspect the jobsite before suspending the permit at the end of the shift, or closing the permit indicating the work had been completed, and (3) craft supervisors often left permits on the control room desk at the end of a shift, rather than personally returning them to the responsible operations representative, as required by the procedure.

·      Although the PTW system was monitored by the lead safety operator, no indications of problems were reported, and management did not independently review the operation of the system. Based upon an absence of information to the contrary, management assumed that they “knew that things were going all right.” It is noted that a senior maintenance technician had voiced his concerns about the PTW system at a meeting at corporate headquarters earlier in the year. In addition, the company had entered a guilty plea in a civil legal proceeding involving a worker fatality caused, in part, by a PTW system problem; however, no substantive improvements in the PTW system resulted.

·      The diesel-powered fire pumps had been placed in manual control mode due to the presence of divers in the water around the platform. This practice was more conservative than company policies and a 1983 fire protection audit report had recommended that this practice          be discontinued. Placing the pumps in manual meant that personnel would have had to reach the pumps to start them after the explosion. However, conditions prevented this and, as a result, the Piper Alpha deluge system was unavailable.

·      Had firewater been available, its efficacy might have been limited. Distribution piping, including that in the platform module where the fires were most severe, was badly corroded and pluggage of sprinkler heads was a known problem dating back to 1984. Various fixes had been attempted and a project to replace the fire protection piping had been initiated, but work was lagging behind schedule. Tests in May 1988 revealed that approximately 50% of the sprinkler heads in the subject module were plugged.

·      To put the previous two observations in perspective, the structural steel on Piper Alpha had no fireproofing and it was known (at least to management) that “... structural integrity could be lost with 10-15 minutes if a fire was fed from a large pressurized hydrocarbon inventory.”
·      The investigation revealed that emergency response training given to new platform personnel was cursory and not uniformly provided. Workers were required to be trained if they had not been on Piper Alpha in the last six months. However, training was often waived even if the interval was considerably longer, or if the individual reported that he had previously worked off-shore elsewhere. A number of survivors reported that they had never been trained on the location of the life rafts or how to launch them.

·      Evacuation drills were not conducted weekly as required (one 6 month period recorded only 13 drills). No full-scale shutdown drill had been conducted in the three years prior to the explosion.
·      Platform managers had not been trained on their response to such an emergency on another platform (Note: that the various platforms were owned or operated by different companies.)

·      Approximately one year before the explosion, company management had been cautioned in an engineering report that a large fire from escaping gas could pose serious concerns with respect to the safe evacuation of the platform. However management discounted the likelihood of such an event, citing existing protective systems. In fact, the gas risers upstream of the emergency isolation valves on Piper Alpha were not protected against fire exposure and, because of the diameter and length of the inter-platform gas lines, several days would be required to depressurize the pipelines in the event of a breach. It was the failure of these lines that destroyed Piper Alpha and prevented its evacuation.




Aftermath :

Because of damages costing almost $3.4 billion, the Piper Alpha disaster was the largest man-made disaster at the time and continues to be the worst offshore oil disaster in terms of life lost and industry impact. Although the Cullen Inquiry found Occidental guilty of inadequate maintenance and safety procedures, no criminal charges were brought against the company.

The inquiry resulted in 106 recommendations for changes to North Sea safety procedures—all 106 were accepted by the industry. And finally, a 3-year investigation into the safety and integrity of over 100 offshore installations.


Video of the explosion :


http://www.youtube.com/watch?v=mBYdDeVOuQo


National Geographic Documentary :


http://www.youtube.com/watch?v=7VXHiQ0bViU



Saturday, March 8, 2014

Ocean Ranger Accident

Ocean Ranger Accident
Newfoundland waters, Canada, 1982


Summary data:

Date: February 15, 1982
Place: Around 270 kilometers east of St. John's, Newfoundland, Canada.
Type of accident: Semi-submersible mobile offshore drilling unit sinking
Outcome: A huge storm caused the sinking of Ocean Ranger, killing the whole crew (84 men).

 
Ocean Ranger rig overview

Ocean Ranger was designed and owned by Ocean Drilling and Exploration Company, Inc. (ODECO) of New Orleans. The vessel was a self-propelled large semi-submersible design with a drilling facility and living quarters. It was capable of operation beneath 1,500 feet (460 m) of ocean water and could drill to a maximum depth of 25,000 feet (7,600 m). It was described by ODECO as the world's largest semi-submersible oil rig to date.

Constructed for ODECO in 1976 by Mitsubishi Heavy Industries in Hiroshima, Japan, Ocean Ranger was 396 feet (121 m) long, 262 feet (80 m) wide, and 337 feet (103 m) high. It had twelve 45,000-pound (20,000 kg) anchors. The weight was 25,000 tons. It was floating on two 122-metre (400 ft) long pontoons that rested 24 metres (79 ft) below the surface.

The vessel was approved for 'unrestricted ocean operations' and designed to withstand extremely harsh conditions at sea, including 100-knot (190 km/h) winds and 110-foot (34 m) waves. Prior to moving to the Grand Banks area in November 1980, it had operated off the coasts of Alaska, New Jersey and Ireland.Valdez, Alaska to Los Angeles, California, ran aground on Bligh Reef in Prince William Sound, Alaska. The vessel was traveling outside normal shipping lanes in an attempt to avoid ice. Within six hours of the grounding, the Exxon Valdez spilled approximately 10.9 million gallons of its 53 million gallon cargo of Prudhoe Bay crude oil. Eight of the eleven tanks on board were damaged. The oil would eventually impact over 1,100 miles of non-continuous coastline in Alaska, making the Exxon Valdez one of the largest oil spill in U.S. waters.


What happened?

On 26 November 1981, the Ocean Ranger commenced drilling well J-34, its third well in the Hibernia Oil Field. The Ocean Ranger was still working on this well in February 1982 when the sinking occurred. Two other semi-submersible rigs were also drilling nearby: the Sedco 706, 8.5 miles (13.7 km) NNE, and the Zapata Ugland, 19.2 miles (30.9 km) N of the Ocean Ranger.

On 14 February 1982, the rigs received reports of an approaching storm linked to a major Atlantic cyclone from NORDCO Ltd, the company responsible for issuing offshore weather forecasts. The usual method of preparing for bad weather involved hanging-off the drillpipe at the sub-sea wellhead and disconnecting the riser from the sub-sea stack. Due to surface difficulties and the speed at which the storm developed, the crew of the Ocean Ranger were forced to shear the drillpipe after hanging-off, after which they disconnected the riser in the early evening.


One of the few pictures of Ocean Ranger’s sinking
(Source: Radio Canada)

At about 7 p.m (local time), the nearby Sedco 706 experienced a large, powerful wave which damaged some items on deck and caused the loss of a life raft. Soon after, radio transmissions were heard from the Ocean Ranger, describing a broken portlight (a porthole window) and water in the ballast control room, with discussions on how best to repair the damage. The Ocean Ranger reported experiencing storm seas of 55 feet, with the odd wave up to 65 feet, thus leaving the unprotected portlight at 28 feet above mean sea level vulnerable to wave damage. Some time after 2100 hours, radio conversations originating on the Ocean Ranger were heard on the Sedco 706 and Zapata Ugland, noting that valves on the Ocean Ranger's ballast control panel appeared to be opening and closing of their own accord. The radio conversations also discussed the 100-knot (190 km/h) winds and waves up to 65 feet (20 m) high. Through the remainder of the evening, routine radio traffic passed between the Ocean Ranger, its neighbouring rigs and their individual support boats. Nothing out of the ordinary was noted.

At 00h52 (local time), on 15 February, a MAYDAY call was sent out from the Ocean Ranger, noting a severe list to the port side of the rig and requesting immediate assistance. This was the first communication from the Ocean Ranger identifying a major problem. The standby vessel, the M/V Seaforth Highlander, was requested to come in close as countermeasures against the 10-15 degree list were proving ineffective. The onshore MOCAN supervisor was notified of the situation, and the Canadian Coast Guard and Mobil-operated helicopters were alerted just after 0100 hours local time. The M/V Boltentor and the M/V Nordertor, the standby boats of the Sedco 706 and the Zapata Ugland respectively, were also dispatched to the Ocean Ranger to provide assistance. At 0130 hours local time, the Ocean Ranger transmitted its last message: 'There will be no further radio communications from the Ocean Ranger. We are going to lifeboat stations'. Shortly thereafter, in the middle of the night and in the midst of atrocious winter weather, the crew abandoned the rig. The rig remained afloat for another 90 minutes, sinking between 0307 and 0313 hours local time.

Whilst the rig was provided with an Emergency Procedures Manual which detailed evacuation procedures, it is unclear how effectively the rig evacuation was carried out. There is evidence that at least one lifeboat was successfully launched with up to 36 crew inside, and witnesses on the M/V Seaforth Highlander reported seeing at least 20 crew members in the water at the same time, suggesting that at least 56 crew successfully evacuated the rig. The United States Coast Guard report speculated that 'these men either chose to enter the water directly or were thrown into the water as a result of unsuccessful lifesaving equipment launching'. Rescue attempts by the standby vessels were hampered by the adverse weather conditions and the conclusion that the standby boats were neither equipped nor configured to rescue casualties from a cold sea. As a result of the severe weather, the first helicopter did not arrive on scene until 0430 hours local time, by which time most if not all of the Ocean Ranger's crew had succumbed to hypothermia and drowned. Over the next week, 22 bodies were recovered from the North Atlantic. Autopsies indicated that those men had died as a result of drowning while in a hypothermic state.

The remains of the rig itself were found by sonar search over the following weeks, resting in an inverted position approximately 485 feet south-east of the wellhead, surrounded by major items of debris such as the derrick. The rig had capsized bow-first, turning over and striking the sea floor with the forward ends of the rig's pontoons.


Conclusion

The United States Coast Guard Marine Board of Investigation report into the Ocean Ranger sinking summarized the chain of events leading to the loss of the Ocean Ranger as follows:

·      A large wave appeared to cause a broken portlight;
·      The broken portlight allowed the ingress of sea water into the ballast control room;
·      The ballast control panel malfunctioned or appeared to malfunction to the crew;
·      As a result of this malfunction or perceived malfunction, several valves in the rig's ballast control system opened due to a short-circuit, or were manually opened by the crew;
·      The Ocean Ranger assumed a forward list;
·      As a result of the forward list, boarding seas began flooding the forward chain lockers located in the forward corner support columns;
·      The forward list worsened;
·      The pumping of the forward tanks was not possible using the usual ballast control method as the magnitude of the forward list created a vertical distance between the forward tanks and the ballast pumps located astern that exceeded the suction available on the ballast system's pumps;
·      Detailed instructions and personnel trained in the use of the ballast control panel were not available;
·      At some point, the crew blindly attempted to manually operate the ballast control panel using brass control rods;
·      At some point, the manually operated sea valves in both pontoons were closed;
·      Progressive flooding of the chain lockers and subsequent flooding of the upper deck resulted in a loss of buoyancy great enough to cause the rig to capsize.


Ocean Ranger’s sketch representing the location of the control room (number 3 on the drawing)

The Canadian Royal Commission spent two years looking into the disaster. The commission concluded that the Ocean Ranger had design and construction flaws, particularly in the ballast control room, and that the crew lacked proper safety training, survival suits and equipment. There was no suggestion that it was caused by a rogue wave, as some recent articles have suggested. The Canadian Royal Commission also concluded that inspection and regulation by United States and Canadian government agencies was ineffective.


Video / Summary:


http://www.youtube.com/watch?v=npPMoHz7Rgg


Sources:
·      www.cbc.ca
·      The Energy Library : http://www.theenergylibrary.com

·      "The Report of the Royal Commission (Canada) on the Ocean Ranger Marine Disaster". Ottawa: Canadian Government Publishing Centre. 1984.